In 2003, as a resolution to seismic problems of the aging 1927 span, a new suspension bridge was opened to replace it. The new span features a pedestrian and bicycle path, completing a bike trail which circles the entire Bay Area. The new span measures 0.66 miles (3465 feet / 1056.1 m / 1.06 km). At the completion of the project, the bridge was the newest suspension bridge built in the United States.
Silverman & Light completed electrical engineering and lighting design for the new bridge.
Architect: WSP (formerly Parsons Transportation Group)
General Contractor: Caltrans