The San Francisco Civic Center Complex project consisted of a $265 million historic renovation and seismic retrofit of the seven-story 200,000 SF historic California Supreme Court Building and the construction of a new fourteen-story 810,000 SF adjoining government office tower.
Silverman & Light provided electrical engineering, lighting design, and life safety systems design for the project.
As part of the electrical design, the new 810,000 SF office building utilized a 12kV medium voltage vertical distribution system providing significant cost savings to the project.
Architect: SOM
General Contractor: Clark Construction